Coronys ETS™ – Effective Testing Solutions for Teams and Individuals
There is a growing need for continuous release of new , more powerful and complex products at competitive prices and within shorter time cycles.
The cost of an error increases exponentially for each consecutive stage. e.g. The cost of detecting and fixing a bug during integration is 10 times higher than if it was detected and fixed during development. These huge error driven damages can be avoided by managing quality along the entire product life cycle.
Managers at all levels should take information based decisions of large number of products, releases and versions.
Testing automation is the only solution for meeting these goals while operating within budget and resources imitations, and severe time constrains.
Coronys ETS™ provides a comprehensive framework for end-to-end testing and validation solutions for the whole product life cycle.
Different teams and team members use the plethora of Coronys ETS™ tools and features to design, document, execute extensive testing and manage all testing activities and assets related to a project or product.
Coronys ETS™ makes testing a simple, manageable, cost-effective and satisfying task. Examples of team members who benefit from this integral approach are:
Project Managers:For having full visibility of ALL project testing, validation and maturity status, enabling manager to make information based decisions.
S/W developers; Run unit testing, sanity and regression tests prior to releasing the S/W modules to integration.
H/W developers: Exercise Unit Under development and test it using numerous excitations, set ups, configuration, and multiple parameters in order to validate its proper operation according to spec.
Integration Teams: Run functional testing of the integrated product/system, and regression before releasing to more in depth testing by QA
Validation, Verification and QA: Define, develop, than execute extensive functional of the integrated product/system, validate performance and run stress testing for all possible parameters (including environmental ) and according to Spec. Prior to releasing the product for Production. Run massive regression for each release and version. Analyze and manage all test results and reports.
Production managers: Run in-line automatic testing at each production station; automatic burning of firmware, IP’s, ID’s, setups and configurations. Final testing of the product before packaging. Manage all tests results related to each product ; enable production data collection, processing and analyzing as part of product and yields improvement processes.
Repair technicians: Select all relevant test procedures of a faulty product along with its history; Execute relevant test procedures and by exercising the faulty product find fault and fix it. Than validate its proper operation.